Engineering, Procurement, Installation and Commissioning (EPIC)

Electrical Work For Installation 30KW Fan Heater

Electrical Work For Moving Floor System

Electrical Work For Palm Kernel Shell Screening System

Electrical Work For Moving Floor System

INSTALLED HOUSING FOR EIC 2031

LAID CABLE FOR AIR COMPRESSOR AND AIR DRYER

FABRICATED SUPPORT FOR ECICs' HOUSING

INSTALLED JUNCTION BOX FOR AIR COMPRESSOR POWER CABLE

TERMINATION WORK FOR LIMIT SWITCH AT SG-111 AND SG-112

CABLE DRESSING FOR MOTORIZE VALVE AT RINSING TANK (SV-2061)