PROJECT HISTORY

WORKSPACECLIENTLOCATION
Electrical work for machine PASX 410 no.5 FGV Palm Industries Sdn Bhd Kilang Sawit Chiku, Kelantan
Sweco motor installation FGV Palm Industries Sdn Bhd Kilang Sawit Tersang, Pahang
VPN port forwarding into the browser/ server by using mikrotik IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Electrical work for I/O panel B027C Soon Soon Oilmills Sdn Bhd Westport, Pulau Indah, Selangor
Project ESP (LKKP project) Jit Hoe Engineering (M) Sdn Bhd Kilang Sawit Lkpp Corporation Sdn Bhd, Gambang Pahang
Electrical work for system and control room biogas plant FGV Palm Industries Sdn Bhd Loji Janakuasa Biogas Serting Hilir, Bandar Seri Jempol, Negeri Sembilan
Electrical work and installation of display panel junction box flowmeter FGV Palm Industries Sdn Bhd Kilang Sawit Jengka 8, Pahang
Electrical work and installation of Hydro cyclone 3.5mt FGV Palm Industries Sdn Bhd Kilang Sawit Tementi, Triang Pahang
Supply, fabricate and install new standing to control panel on HDG tray Eastforce (M) Sdn Bhd Kilang Sawit Felcra Processing & Engineering Sdn Bhd Batu 12, Jalan Bidor, Perak
Cabling, testing and termination works for bunch conditioner from the cs top to EFB conveyor no.2 FGV Palm Industries Sdn Bhd Kilang Sawit Trolak, Perak
Electrical work for ESP system MKRS Bumi (M) Sdn Bhd Kilang Sawit Triang, Pahang
Electrical work for ESP system and construction work for MSB room MKRS Bumi (M) Sdn Bhd Kilang Sawit Serting Hilir, Negeri Sembilan
TNB SUBSTATION IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
SWECO MOTOR INSTALLATION  FGV Palm Industries Sdn Bhd KILANG SAWIT JENGKA 8
FLOW METER INSTALLATION  FGV Palm Industries Sdn Bhd KILANG SAWIT JENGKA 8
KERNAL SILO A FGV Palm Industries Sdn Bhd KILANG SAWIT JERANGAU BARAT
KERNAL SILO B FGV Palm Industries Sdn Bhd KILANG SAWIT JERANGAU BARAT
KERNAL SILO ELEVATOR  FGV Palm Industries Sdn Bhd KILANG SAWIT JERANGAU BARAT
CROSS CONVEYOR  FGV Palm Industries Sdn Bhd KILANG SAWIT KECHAU B
DESTONER  FGV Palm Industries Sdn Bhd KILANG SAWIT BUKIT SAGU
SLUDGE SEPARATOR  FGV Palm Industries Sdn Bhd KILANG SAWIT KEMAHANG
HYDROCYCLONE  FGV Palm Industries Sdn Bhd KILANG SAWIT TEMENTI
BIOGASS  FGV Palm Industries Sdn Bhd KILANG SAWIT SERTING HILIR
PLC INSTALLATION  FGV Palm Industries Sdn Bhd KILANG SAWIT TERSANG
IHI REROUTE OPT IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
IHI MANPOWER PERFORMANCE TEST IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
AZ MANPOWER FERFORMANCE TEST IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
UPGRADE PLC IO REMOTE DC SUPPLY SOURCE CABLE SOON SOON OILMILLS SDN BHD WESTPORT, PULAU INDAH
Electrical works at OPT Pellet Plant IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Change over switch for IC Reactor and Polishing Plant IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Lighting inside building area IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
CCTV for IHI 2ND EFB Pellet Plan AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Power upgrade for Crane Power Feed Calspan Aero System Engineering Airport Subang
To replace electrical pole near SS1 IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Supply, install and testing power socket, lighting and cabling at outside area (100,200,300 system) IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Supply, install and testing changeover switch panel and cabling from biogas genset IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Supplying concrete trenches IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Upgrading MSB AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
2ND EFB Pellet Plant AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Cabling work for emergency switch at fibre cutter AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Provide remote access to LAN for IMS system IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Installation work for lightning arrestor for the chimney AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Installation in the panel such as PLC Unit, Terminal Block, MCCB, MCB, Relay & Power Unit J & Hang Engineering Petaling Jaya, Selangor
Hoist Power Supply Cable Relocation/ Modification/ Termination SSK Resources Sdn Bhd Bangi, Selangor
Cabling work (Locating Underground Cable Fault) Sri Jelutong Palm Oil Sdn Bhd Muadzam Shah, Pahang
POME treatment plant IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Hacking Wall AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Relocate Blower AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Fiber Cutter Panel AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
The Bag Filter Fan and B-616 AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Pelletizer Panel AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Belt Conveyor AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
HGG System AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Air Compressor System AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Pulse Valve AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
To insert starter in the LCP A (S-103) & (S-104) AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Silo Extraction Device (X-601B) AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Fibre Spreader (S-203A) AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Sliding Gate (SG-111) AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Fibre Spreader (S-206A) AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Sliding Gate FIbre Cutter (SG-502, SG-503, SG-504) AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Sliding Gate (SG-112) AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Motor Louver Cooling (CY609) AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
To install support, cable tray, lay cable, provide PLC Program and test the motor for N-617 AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Install Thermal Overload Relay in the X-604 Panel AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Install Thermal Overload Relay in the X-605 Panel AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Knife Sharpener Machine AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Provide Housing and Support for Housing and Local Panel AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Earthing system AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Pressure Differential Gauge AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
To install support, cable tray, lay cable and test the motor for N-420 and L-420 AZ Renewable Energy Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Upgrading Motor Elevator - Line A FGV Palm Industries Sdn Bhd Kilang Sawit Serting Hilir, Negeri Sembilan
Upgrading Nut Elevator - Line B FGV Palm Industries Sdn Bhd Kilang Sawit Serting Hilir, Negeri Sembilan
EFB Pellet Plant BAC Biomass Sdn Bhd Kampung Gajah, Perak
Condensate recycle system FGV Palm Industries Sdn Bhd Kilang Sawit Triang, Pahang
Modification the watering system at Kolam Algae and Fakultatif FGV Palm Industries Sdn Bhd Kilang Sawit Jengka 8, Pahang
Scrapper conveyor and return conveyor for moving floor system FGV Palm Industries Sdn Bhd Kilang Sawit Chini 3, Pahang
Motor pump and lighting condensate recycle FGV Palm Industries Sdn Bhd Kilang Sawit Keratung 3, Pahang
Machine polishing shell for sistem penapis shell Felda Bulkers Sdn Bhd Pelabuhan Kuantan, Pahang
Sistem Penapis Shell Felda Bulkers Sdn Bhd Pelabuhan Kuantan, Pahang
Electrical work for upgrading pre-cleaner FGV Palm Industries Sdn Bhd Kilang Sawit Lepar 6, Pahang
Electrical work for upgrading ID fan FGV Palm Industries Sdn Bhd Kilang Sawit Lepar 6, Pahang
Electrical work for palm kernel shell screening system Felda Bulkers Sdn Bhd Pelabuhan Kuantan, Pahang
Electrical work for moving floor system FGV Palm Industries Sdn Bhd Kilang Sawit Lepar Utara 6, Pahang
Motor vac shell conveyer FGV Palm Industries Sdn Bhd Kilang Sawit Chini 3, Pahang
INSTALLED HOUSING FOR EIC 2031 IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
LAID CABLE FOR AIR COMPRESSOR AND AIR DRYER IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
FABRICATED SUPPORT FOR ECICs' HOUSING IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
INSTALLED JUNCTION BOX FOR AIR COMPRESSOR POWER CABLE IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
TERMINATION WORK FOR LIMIT SWITCH AT SG-111 AND SG-112 IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
CABLE DRESSING FOR MOTORIZE VALVE AT RINSING TANK (SV-2061) IHI Solid Biomass Malaysia Sdn Bhd Kilang Sawit Dominion Square Gambang, Pahang
Electrical wiring work for the pump, pre cleaner, air compressor, stirrer VCT, as well as lighting and others for the EFB juice recovery system FGV Palm Industries Sdn Bhd FGV Bukit Kepayang, Pahang
Providing manpower, materials, equipment, and all necessities for installing armored cable from the existing supply point to the insulation motor for FFB No. 4. Installing the distribution board complete with inverter relay start/stop button and emergency switch for FFB No. 4, along with the transmit cable to the motor. Conducting fine-tuning calibration and commissioning of the machine, along with the lighting system in the areas of FFB No. 3 and No. 4 FGV Palm Industries Sdn Bhd FGV Kilang Sawit Serting Hilir
Providing manpower, materials, equipment, transportation, and other necessities for the new electrical and lighting installation for the direct conveyor from the shredded plant to the boiler FGV Palm Industries Sdn Bhd Kilang Sawit Chini 3, Pahang
Providing manpower, equipment, transportation, and all necessities to carry out the new installation of a 4C power supply cable from the distribution board panel to the new 250KW genset over a distance of 70 meters, including breaking and re-concreting the floor in the engine room FGV Palm Industries Sdn Bhd Kilang Sawit Tersang, Pahang
Providing manpower, equipment, and all necessities for the installation of 10 new control panels for the hydraulic press PLC system, including touch screen HMU, electrical wiring, cable tray with current transformer, transducer, 1U 4KW hydraulic motor with solenoid valve, pressure sensor, and looping cable for the new press system FGV Palm Industries Sdn Bhd Kilang Sawit Tersang, Pahang
Providing manpower, equipment, and all necessities for the installation of 1 unit of control panel, 2 units of shredded machines, including the installation of 1X 4C x 150 SQMM XLPE/SWA cable. This includes dismantling and opening the incomer cable tray, power cable, and control panel for 2 units of old shredded machines, as well as conducting testing and troubleshooting for 2 units of YKL 90KW shredded machines FGV Palm Industries Sdn Bhd Kilang Sawit Jengka 21, Pahang
Providing manpower, equipment, and all necessities for the new installation of 1 unit of control panel for the YKL 95KW shredder system, complete with HDG cable, ladder, support, bracket, and glanding. Installation of 1X4C x 70 sqmm armored cable from the existing distribution board to the shredder machine. Reinstallation of the control panel complete with HDG cable, ladder, support, bracket, and glanding for the press machine on the 3rd floor. Troubleshooting for 1 unit of 75KW machine, 1 unit of 95KW machine, and 2 units of transfer pump systems FGV Palm Industries Sdn Bhd Kilang Sawit Mempaga, Bentong, Pahang
Checking & replacing heat tracking sensor MKRS Group (M) Sdn Bhd Kerteh Bio-Polymer Park Phase 2, Kemaman, Terengganu
Supply material, manpower, transport and lodging for Electrical Works (MAG HANGAR 6) MKRS Group (M) Sdn Bhd KLIA, Sepang, Selangor
Providing manpower, materials, equipment, and all necessities for the electrical system installation on the new 1.6W turbine FGV Palm Industries Sdn Bhd FGV Kilang Sawit Aring A, Kelantan
Supply and manage manpower for operation system 100 to 300,400-600 & Maintenance at ISBM Biomass Plant Gambang IHISolid Biomass (M) Sdn Bhd Dominion Square Plant, Gambang, Pahang
To provide electrical and instrumentation installation consists of manpower, cabling, fabrication, cable glanding, cable termination and testing commissioning Az Renewable Energy Sdn Bhd Kilang Sawit Jengka 3, Pahang