Electrical work for machine PASX 410 no.5 |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Chiku, Kelantan |
Sweco motor installation |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Tersang, Pahang |
VPN port forwarding into the browser/ server by using mikrotik |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Electrical work for I/O panel B027C |
Soon Soon Oilmills Sdn Bhd |
Westport, Pulau Indah, Selangor |
Project ESP (LKKP project) |
Jit Hoe Engineering (M) Sdn Bhd |
Kilang Sawit Lkpp Corporation Sdn Bhd, Gambang Pahang |
Electrical work for system and control room biogas plant |
FGV Palm Industries Sdn Bhd |
Loji Janakuasa Biogas Serting Hilir, Bandar Seri Jempol, Negeri Sembilan |
Electrical work and installation of display panel junction box flowmeter |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Jengka 8, Pahang |
Electrical work and installation of Hydro cyclone 3.5mt |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Tementi, Triang Pahang |
Supply, fabricate and install new standing to control panel on HDG tray |
Eastforce (M) Sdn Bhd |
Kilang Sawit Felcra Processing & Engineering Sdn Bhd Batu 12, Jalan Bidor, Perak |
Cabling, testing and termination works for bunch conditioner from the cs top to EFB conveyor no.2 |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Trolak, Perak |
Electrical work for ESP system |
MKRS Bumi (M) Sdn Bhd |
Kilang Sawit Triang, Pahang |
Electrical work for ESP system and construction work for MSB room |
MKRS Bumi (M) Sdn Bhd |
Kilang Sawit Serting Hilir, Negeri Sembilan |
TNB SUBSTATION |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
SWECO MOTOR INSTALLATION |
FGV Palm Industries Sdn Bhd |
KILANG SAWIT JENGKA 8 |
FLOW METER INSTALLATION |
FGV Palm Industries Sdn Bhd |
KILANG SAWIT JENGKA 8 |
KERNAL SILO A |
FGV Palm Industries Sdn Bhd |
KILANG SAWIT JERANGAU BARAT |
KERNAL SILO B |
FGV Palm Industries Sdn Bhd |
KILANG SAWIT JERANGAU BARAT |
KERNAL SILO ELEVATOR |
FGV Palm Industries Sdn Bhd |
KILANG SAWIT JERANGAU BARAT |
CROSS CONVEYOR |
FGV Palm Industries Sdn Bhd |
KILANG SAWIT KECHAU B |
DESTONER |
FGV Palm Industries Sdn Bhd |
KILANG SAWIT BUKIT SAGU |
SLUDGE SEPARATOR |
FGV Palm Industries Sdn Bhd |
KILANG SAWIT KEMAHANG |
HYDROCYCLONE |
FGV Palm Industries Sdn Bhd |
KILANG SAWIT TEMENTI |
BIOGASS |
FGV Palm Industries Sdn Bhd |
KILANG SAWIT SERTING HILIR |
PLC INSTALLATION |
FGV Palm Industries Sdn Bhd |
KILANG SAWIT TERSANG |
IHI REROUTE OPT |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
IHI MANPOWER PERFORMANCE TEST |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
AZ MANPOWER FERFORMANCE TEST |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
UPGRADE PLC IO REMOTE DC SUPPLY SOURCE CABLE |
SOON SOON OILMILLS SDN BHD |
WESTPORT, PULAU INDAH |
Electrical works at OPT Pellet Plant |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Change over switch for IC Reactor and Polishing Plant |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Lighting inside building area |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
CCTV for IHI 2ND EFB Pellet Plan |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Power upgrade for Crane Power Feed |
Calspan Aero System Engineering |
Airport Subang |
To replace electrical pole near SS1 |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Supply, install and testing power socket, lighting and cabling at outside area (100,200,300 system) |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Supply, install and testing changeover switch panel and cabling from biogas genset |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Supplying concrete trenches |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
|
|
|
Upgrading MSB |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
2ND EFB Pellet Plant |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Cabling work for emergency switch at fibre cutter |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Provide remote access to LAN for IMS system |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Installation work for lightning arrestor for the chimney |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Installation in the panel such as PLC Unit, Terminal Block, MCCB, MCB, Relay & Power Unit |
J & Hang Engineering |
Petaling Jaya, Selangor |
Hoist Power Supply Cable Relocation/ Modification/ Termination |
SSK Resources Sdn Bhd |
Bangi, Selangor |
Cabling work (Locating Underground Cable Fault) |
Sri Jelutong Palm Oil Sdn Bhd |
Muadzam Shah, Pahang |
POME treatment plant |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Hacking Wall |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Relocate Blower |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Fiber Cutter Panel |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
The Bag Filter Fan and B-616 |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Pelletizer Panel |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Belt Conveyor |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
HGG System |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Air Compressor System |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Pulse Valve |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
To insert starter in the LCP A (S-103) & (S-104) |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Silo Extraction Device (X-601B) |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Fibre Spreader (S-203A) |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Sliding Gate (SG-111) |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Fibre Spreader (S-206A) |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Sliding Gate FIbre Cutter (SG-502, SG-503, SG-504) |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Sliding Gate (SG-112) |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Motor Louver Cooling (CY609) |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
To install support, cable tray, lay cable, provide PLC Program and test the motor for N-617 |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Install Thermal Overload Relay in the X-604 Panel |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Install Thermal Overload Relay in the X-605 Panel |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Knife Sharpener Machine |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Provide Housing and Support for Housing and Local Panel |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Earthing system |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Pressure Differential Gauge |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
To install support, cable tray, lay cable and test the motor for N-420 and L-420 |
AZ Renewable Energy Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Upgrading Motor Elevator - Line A |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Serting Hilir, Negeri Sembilan |
Upgrading Nut Elevator - Line B |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Serting Hilir, Negeri Sembilan |
EFB Pellet Plant |
BAC Biomass Sdn Bhd |
Kampung Gajah, Perak |
Condensate recycle system |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Triang, Pahang |
Modification the watering system at Kolam Algae and Fakultatif |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Jengka 8, Pahang |
Scrapper conveyor and return conveyor for moving floor system |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Chini 3, Pahang |
Motor pump and lighting condensate recycle |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Keratung 3, Pahang |
Machine polishing shell for sistem penapis shell |
Felda Bulkers Sdn Bhd |
Pelabuhan Kuantan, Pahang |
Sistem Penapis Shell |
Felda Bulkers Sdn Bhd |
Pelabuhan Kuantan, Pahang |
Electrical work for upgrading pre-cleaner |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Lepar 6, Pahang |
Electrical work for upgrading ID fan |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Lepar 6, Pahang |
Electrical work for palm kernel shell screening system |
Felda Bulkers Sdn Bhd |
Pelabuhan Kuantan, Pahang |
Electrical work for moving floor system |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Lepar Utara 6, Pahang |
Motor vac shell conveyer |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Chini 3, Pahang |
INSTALLED HOUSING FOR EIC 2031 |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
LAID CABLE FOR AIR COMPRESSOR AND AIR DRYER |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
FABRICATED SUPPORT FOR ECICs' HOUSING |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
INSTALLED JUNCTION BOX FOR AIR COMPRESSOR POWER CABLE |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
TERMINATION WORK FOR LIMIT SWITCH AT SG-111 AND SG-112 |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
CABLE DRESSING FOR MOTORIZE VALVE AT RINSING TANK (SV-2061) |
IHI Solid Biomass Malaysia Sdn Bhd |
Kilang Sawit Dominion Square Gambang, Pahang |
Electrical wiring work for the pump, pre cleaner, air compressor, stirrer VCT, as well as lighting and others for the EFB juice recovery system |
FGV Palm Industries Sdn Bhd |
FGV Bukit Kepayang, Pahang |
Providing manpower, materials, equipment, and all necessities for installing armored cable from the existing supply point to the insulation motor for FFB No. 4. Installing the distribution board complete with inverter relay start/stop button and emergency switch for FFB No. 4, along with the transmit cable to the motor. Conducting fine-tuning calibration and commissioning of the machine, along with the lighting system in the areas of FFB No. 3 and No. 4 |
FGV Palm Industries Sdn Bhd |
FGV Kilang Sawit Serting Hilir |
Providing manpower, materials, equipment, transportation, and other necessities for the new electrical and lighting installation for the direct conveyor from the shredded plant to the boiler |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Chini 3, Pahang |
Providing manpower, equipment, transportation, and all necessities to carry out the new installation of a 4C power supply cable from the distribution board panel to the new 250KW genset over a distance of 70 meters, including breaking and re-concreting the floor in the engine room |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Tersang, Pahang |
Providing manpower, equipment, and all necessities for the installation of 10 new control panels for the hydraulic press PLC system, including touch screen HMU, electrical wiring, cable tray with current transformer, transducer, 1U 4KW hydraulic motor with solenoid valve, pressure sensor, and looping cable for the new press system |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Tersang, Pahang |
Providing manpower, equipment, and all necessities for the installation of 1 unit of control panel, 2 units of shredded machines, including the installation of 1X 4C x 150 SQMM XLPE/SWA cable. This includes dismantling and opening the incomer cable tray, power cable, and control panel for 2 units of old shredded machines, as well as conducting testing and troubleshooting for 2 units of YKL 90KW shredded machines |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Jengka 21, Pahang |
Providing manpower, equipment, and all necessities for the new installation of 1 unit of control panel for the YKL 95KW shredder system, complete with HDG cable, ladder, support, bracket, and glanding. Installation of 1X4C x 70 sqmm armored cable from the existing distribution board to the shredder machine. Reinstallation of the control panel complete with HDG cable, ladder, support, bracket, and glanding for the press machine on the 3rd floor. Troubleshooting for 1 unit of 75KW machine, 1 unit of 95KW machine, and 2 units of transfer pump systems |
FGV Palm Industries Sdn Bhd |
Kilang Sawit Mempaga, Bentong, Pahang |
Checking & replacing heat tracking sensor |
MKRS Group (M) Sdn Bhd |
Kerteh Bio-Polymer Park Phase 2, Kemaman, Terengganu |
Supply material, manpower, transport and lodging for Electrical Works (MAG HANGAR 6) |
MKRS Group (M) Sdn Bhd |
KLIA, Sepang, Selangor |
Providing manpower, materials, equipment, and all necessities for the electrical system installation on the new 1.6W turbine |
FGV Palm Industries Sdn Bhd |
FGV Kilang Sawit Aring A, Kelantan |
Supply and manage manpower for operation system 100 to 300,400-600 & Maintenance at ISBM Biomass Plant Gambang |
IHISolid Biomass (M) Sdn Bhd |
Dominion Square Plant, Gambang, Pahang |
To provide electrical and instrumentation installation consists of manpower, cabling, fabrication, cable glanding, cable termination and testing commissioning |
Az Renewable Energy Sdn Bhd |
Kilang Sawit Jengka 3, Pahang |